Production
Inspection schedule
Material, initial, inline and final inspections for lines that haven't shipped. Tap a type to filter, tap a line to open it.
Add a CB2 PO
Drop the Infor Nexus PO PDF and the tracker reads it for you.
| PO | Line | SKU | Description | Qty | Material insp. | Initial insp. | Inline insp. | Final insp. | Final ship date | Status |
|---|
Submit a shipment
Drop the shipping document (BL, booking confirmation, shipping instruction or packing list). The tracker reads the container, vessel, ETD and ETA. Check the details, tick the PO lines and submit.
Shipments submitted
Download a summary of the shipments your export team submitted: one row per container (vessel, ETD, ETA, BL, POs, pcs) plus every shipped line. Leave the dates empty for all shipments.
Change log
Every change made on the website: who, when, what it was before and after. Use the search box at the top to filter. Only admins see this.
| When | Who | What | PO / line | Field | Before | After | Details |
|---|
Create logins, reset passwords and switch people off. Give everyone their own login so the change log shows who did what. A reset or a role change signs that person out on every device.
| Name | Username | Role | Status | Created |
|---|